which testing the single long wire and the connected condition of directly connected switch.Taking use of the hierarchical features of FPGA Cleverly and using the method of overall expanding and cycle routing by line for routing.In the process of routing
taking use of several strategies
such as the whole group
multiple points routing
and comprehensive appraisal etc.
reducing the probability of the post resources conflict and the back rate effectively
enhancing the quality and efficiency of cabling greatly.In the process of demolishing and re-routing
taking partial
instead of integral demolition mechanism
greatly reduce the number of the lines that will be demolished
can greatly improve the speed.The experimental results show that this algorithm has advantages of high efficiency in the wiring
high rate in the coverage of single long wire resources