the multi-objective flexible job shop scheduling problem (FJSP) and the basic bat algorithm are introduced at first. Secondly
the basic bat algorithm is improved and combined with the variable neighborhood search algorithm to obtain a new hybrid bat algorithm (HBA). In HBA
an individual position vector representation method and the conversion mechanism between the individual position vector and the scheduling solution are designed. In addition
a population initialization scheme and two neighborhood structures are given
and a variable neighborhood algorithm is introduced to enhance the searching ability. Finally
benchmark instances are simulated to demonstrate the effectiveness of the proposed algorithm.
关键词
Keywords
references
Yuan Y, Xu H, Yang J. A hybrid harmony search algorithm for the flexible job shop scheduling problem[J]. Applied Soft Computing, 2013, 13(7): 3259-3272. DOI: 3259
Demir Y, Īsleyen S K. An effective genetic algorithm for flexible job-shop scheduling with overlapping in operations[J]. International Journal of Production Research, 2014, 52(13): 3905-3921. DOI: 3905
Yang X S. A new metaheuristic bat-inspired algorithm[C]//Nature inspired cooperative strategies for optimization (NICSO 2010). Germany: Springer, Berlin Heidelberg, 2010: 65-74.
Marichelvam M K, Prabaharan T, Yang X S, et al. Solving hybrid flow shop scheduling problems using bat algorithm[J]. International Journal of Logistics Economics and Globalisation, 2013, 5(1): 15-29. DOI: 15
Xia W, Wu Z. An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems[J]. Computers % Industrial Engineering, 2005, 48(2): 409-425. DOI: 409
Luo Q, Zhou Y, Xie J, et al. Discrete bat algorithm for optimal problem of permutation flow shop scheduling[J]. The Scientific World Journal, 2014, 25(1): 1-15. DOI: 1
Brandimarte P. Routing and scheduling in a flexible job shop by tabu search[J]. Annals of Operations Research, 1993, 41(1): 157-183 DOI: 157
Kacem I, Hammadi S, Borne P. Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic[J]. Mathematics and computers in simulation, 2002, 60(3): 245-276. DOI: 245