您当前的位置:
首页 >
文章列表页 >
Relation of Reliability of Telecommunication Power System with Designed Construction Maintaining
更新时间:2026-04-20
    • Relation of Reliability of Telecommunication Power System with Designed Construction Maintaining

    • Issue 5, Pages: 9-13(2005)
    • CLC: TN86
    • Published:2005

    移动端阅览

  • 穆谦, 王树岩, 田野. Relation of Reliability of Telecommunication Power System with Designed Construction Maintaining[J]. 2005, (5): 9-13. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

59

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on the pipelined communication reconnaissance design platform
Research on design standardization of communication engineering
Experiment application and performance test of 16T16R technology on 3G and 4G dual-mode base station design
Improving acceptance of indoor distribution
Design and Implementation of Service Logic Execution Environment Based on JAIN SLEE

Related Author

王东
徐正国
李江平
汪玉琳
彭岳龙
甘浩
杨辉
周海峰

Related Institution

中国移动通信集团设计院有限公司山东分公司
中国移动通信集团设计院有限公司
中国移动通信集团设计院有限公司广东分公司
中国移动通信集团河北有限公司保定分公司
北京邮电大学 北京100876东信北邮信息技术有限公司北京
0