中国联通南京分公司,南京,210029
Published:2005
移动端阅览
[1]王强.CDMA前反向链路平衡问题以及导频功率的优化配置[J].电信工程技术与标准化,2005(07):46-49.
王强. Balance of Forward/Reverse Link and Optimization Configure of Pilot Power in CDMA[J]. 2005, (7): 46-49.
[1]王强.CDMA前反向链路平衡问题以及导频功率的优化配置[J].电信工程技术与标准化,2005(07):46-49. DOI:
王强. Balance of Forward/Reverse Link and Optimization Configure of Pilot Power in CDMA[J]. 2005, (7): 46-49. DOI:
CDMA中应该先确定话务模型
然后根据有效容量确定反向链路的有效半径
再通过改变前向链路的参数达到前反向链路的平衡。最后
在链路平衡的条件下
根据小区负载的情况来配置导频功率。
In CDMA the call model is firstly determined
then results in the valid radius according to the valid capability
and the forward/reverse link balance is achived by ways of changing the parameter of forward link. Finally
the pilot power is configed according to cell load on the condition of balance link.
CDMA系统工程手册[M]. 人民邮电出版社 , [美]JhongSamLee,[美]LeonardE.Miller著, 2001
0
Views
85
下载量
2
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution