京移通信设计院有限公司,北京,100035
Published:2005
移动端阅览
[1]张庆安.SDH二纤双向复用段保护环倒换时间计算与工程设计[J].电信工程技术与标准化,2005(10):87-89.
张庆安. System Design and Switching Time Calculation of Bi-directional 2-Fiber MS-SP Ring[J]. 2005, (10): 87-89.
[1]张庆安.SDH二纤双向复用段保护环倒换时间计算与工程设计[J].电信工程技术与标准化,2005(10):87-89. DOI:
张庆安. System Design and Switching Time Calculation of Bi-directional 2-Fiber MS-SP Ring[J]. 2005, (10): 87-89. DOI:
本文对影响SDH二纤双向复用段保护环的倒换时间的各种因素进行了分析
给出了工程设计中的近似计算公式与依据。并提出了工程设计中应考虑的相关要点。
The article analyzes all factors concerning switching time of bi-directional multiplex section protection ring on 2-fiber
gives the approximate engineering calculation formula and basis. Moreover summarzies the gist on engineering design.
0
Views
81
下载量
2
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution