北京煜金桥通信建设监理咨询有限责任公司,北京,100037
Published:2006
移动端阅览
[1]罗建军.高山地区移动通信基站的接地网施工方法[J].电信工程技术与标准化,2006(10):30-32.
罗建军. Discussion on Grounding Measure of GSM Base Station in a Mountainous Area[J]. 2006, (10): 30-32.
[1]罗建军.高山地区移动通信基站的接地网施工方法[J].电信工程技术与标准化,2006(10):30-32. DOI:
罗建军. Discussion on Grounding Measure of GSM Base Station in a Mountainous Area[J]. 2006, (10): 30-32. DOI:
本文通过移动通信网无线基站的工程实践
结合高山地区接地网施工中遇到的具体问题
探讨如何解决高山地质、地理条件下的接地降阻技术措施。
The article analyses the problems in the course of grounding project in a mountainous area
discuss how to reduce the resistance in grounding project in a mountainous area
by the writer’s engineering practice of the wireless base station in GSM network.
0
Views
48
下载量
1
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution