Cement Grinding Station Site Selecting Technique Based on Gray Comprehensive Assessment Method
|更新时间:2026-07-10
|
Cement Grinding Station Site Selecting Technique Based on Gray Comprehensive Assessment Method
Vol. 14, Issue 2, Pages: 126-128(2009)
作者机构:
1. 吉林大学交通学院
2. 长春税务学院
作者简介:
基金信息:
DOI:
CLC:TQ172.8
Published:2009
稿件说明:
移动端阅览
YAO Hong-quan, JIA Hong-fei, WANG Pei-dong. Cement Grinding Station Site Selecting Technique Based on Gray Comprehensive Assessment Method[J]. 2009, 14(2): 126-128.
DOI:
YAO Hong-quan, JIA Hong-fei, WANG Pei-dong. Cement Grinding Station Site Selecting Technique Based on Gray Comprehensive Assessment Method[J]. 2009, 14(2): 126-128.DOI:
Cement Grinding Station Site Selecting Technique Based on Gray Comprehensive Assessment Method
Cement clinker grinding station is one model of the specialization in cement industry production process.Site allocation of cement clinker grinding station is the key step of optimizing the logistics system of cement industry
it is more important to select a proper method for estimating the system.The paper constructs an index system for evaluating site allocation of cement clinker grinding station based on analysis of the factors effecting the site allocation
and builds multilayered gray index assessment m...