您当前的位置:
首页 >
文章列表页 >
Control standard for settlement of pavement caused by a new tunnel passing underneath an existing highway
更新时间:2026-10-22
    • Control standard for settlement of pavement caused by a new tunnel passing underneath an existing highway

    • Vol. 52, Issue 3, Pages: 51-58(2020)
    • DOI:10.11918/201808092    

      CLC: TU433
    • Published:2020

    移动端阅览

  • ZHENG Jun, DING Zhenjie, L, et al. Control standard for settlement of pavement caused by a new tunnel passing underneath an existing highway[J]. 2020, 52(3): 51-58. DOI: 10.11918/201808092.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

217

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization on the opening rate of the open-cut tunnel portal
Analysis of the minimum safe thickness of water inrush in fault fracture zone based on the silo theory
Response of submerged floating tunnel under action of underwater explosion-moving load
Extended perturbation solutions of a non-hydrostatic pressure tunnel based on total load invariant method
Incremental intrusion detection mechanism considering cost-sensitive

Related Author

LIU Tanghong
ZHOU Dan
LIANG Xifeng
NIU Jiqiang
MENG Fanshu
LI Zhaoyang
WANG Yueming
JIAO Qinglei

Related Institution

School of Traffic and Transportation Engineering, Central South University
Key Laboratory of Traffic Safety on Track (Central South University), Ministry of Education
State Key Laboratory for Geomechanics and Deep Underground Engineering (China University of Mining and Technology)
School of Mechanics and Civil Engineering, China University of Mining and Technology
School of Highway, Chang′an University, Xi′an
0