LENG Wuming, LI Yafeng, NIE Rusong, et al. Model test of subgrade mud-pumping of ballastless track for high-speed railway[J]. 2021, 53(3): 118-126.
DOI:
LENG Wuming, LI Yafeng, NIE Rusong, et al. Model test of subgrade mud-pumping of ballastless track for high-speed railway[J]. 2021, 53(3): 118-126.DOI: 10.11918/201907040.
Model test of subgrade mud-pumping of ballastless track for high-speed railway
To investigate the subgrade mud-pumping of ballastless track for high-speed railway
a full-scale model test system was built. The moisture content
matric suction
and excess pore water pressure of the subgrade during the process of subgrade mud-pumping were measured
the hydrodynamic pressure characteristics of the subgrade were analyzed under dynamic loads induced by high-speed trains
and the mechanism and influencing factors of subgrade mud-pumping of ballastless track were evaluated. Results show that the subgrade surface layer of ballastless track was basically saturated after rainfall infiltration. The mud-pumping was likely to happen under the dynamic loads of high-speed trains. The subgrade mud-pumping occurred with an increase in excess pore water pressure
and the increment of excess pore water pressure was constant in the mud-pumping region with an increase in the depth of subgrade surface layer. In saturated situation
the excess pore water pressure of the subgrade on both sides of the concrete base was higher than that below the center line of the subgrade
making mud-pumping more likely to occur. Reducing the water content or pore water pressure of subgrade can be an effective way to control and prevent the occurrence of subgrade mud-pumping.