您当前的位置:
首页 >
文章列表页 >
Calculation method for length of main cable at saddle in long-span suspension bridge
更新时间:2026-10-22
    • Calculation method for length of main cable at saddle in long-span suspension bridge

    • Vol. 52, Issue 9, Pages: 57-62(2020)
    • DOI:10.11918/201909213    

      CLC: U442.5
    • Published:2020

    移动端阅览

  • GAO Qingfei, HONG Nengda, GUO Binqiang, et al. Calculation method for length of main cable at saddle in long-span suspension bridge[J]. 2020, 52(9): 57-62. DOI: 10.11918/201909213.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

235

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Effect of wear on fatigue life of fork-ear plate in hanger connectors of long-span suspension bridges
Characteristics and mechanisms of tension loss in the helical wrapping wires of main cables in suspension bridges
Analysis of wind characteristics at mountain bridge sites under different inflow conditions
Probabilistic seismic demand analysis of irregular continuous girder bridge based on Gaussian mixture modeling
Fine-grained image segmentation method for holistic surface multi-defects in concrete bridges

Related Author

Wang Xiaopeng
Zhou Yongjun
Hou Peiyuan
Li Yi
Liu Yili
Wang Bo
Xiao Jun
Xian Jianping

Related Institution

School of Construction Machinery, Chang′an University, Xi′an
Bay Area Super Major Bridge Maintenance Technology Center of Guangdong Highway Construction Co., Ltd.
School of Highway, Chang′an University, Xi′an
Shaanxi Railway institute
Shaanxi Union Research Center of University and Enterprise for Bridge Intelligent Construction, Xi′an
0