REN Yumou, ZHANG Qi, YUAN Zhiming, et al. Optimization of train platform utilization at high-speed railway stations based on arrival and departure distribution of trains[J]. 2021, 53(8): 137-143.
DOI:
REN Yumou, ZHANG Qi, YUAN Zhiming, et al. Optimization of train platform utilization at high-speed railway stations based on arrival and departure distribution of trains[J]. 2021, 53(8): 137-143.DOI: 10.11918/202102026.
Optimization of train platform utilization at high-speed railway stations based on arrival and departure distribution of trains
To solve the problem of the arrival-departure track utilization planning for high-speed railway stations
an optimization model of train platform utilization based on time segment and multi-objective optimization and an improved fast non-dominated sorting genetic algorithm Ⅱ(NSGA-Ⅱ) were proposed. First
considering the coupling relationship between the arrival-departure tracks and the routes in the throat area
the study period was divided according to the arrival and departure distribution characteristics of the trains. Taking the utilization balance of the train platform
strong planning robustness
and passenger service quality as the optimization objectives
an optimization model of train platform utilization was established by integer programming method. Then
an elite strategy with feasible solutions was designed by introducing constraint domination principle. At last
the actual operation data of a station on the Beijing-Shanghai high-speed railway was taken as an example for simulation verification. Calculation results show that the occupancy cost of the train platform was reduced by 16.98% compared with the original scheme in the normal peak period
which significantly improves the quality of passenger service. During the rush hour
the variance of the occupation time of the platform and the total conflict coefficient were reduced by 48.57% and 29.81% compared with the original scheme
which significantly improves the equipment utilization rate and the robustness of the arrival-departure track utilization plan. In comparison with the overall optimization method
the time segment optimization method could be more targeted in reducing the function value of the optimization objectives. Therefore
considering the influence of train arrival and departure distribution factors on the train platform utilization
it can effectively improve the optimization factors and provide support for making station operation plans during different busy periods.