您当前的位置:
首页 >
文章列表页 >
Calculation of fume-drainage time of tunnel after blasting
更新时间:2026-10-19
    • Calculation of fume-drainage time of tunnel after blasting

    • Vol. 49, Issue 8, Pages: 2017-8(2017)
    • DOI:10.11918/j.issn.0367-6234.201605096    

      CLC: X9
    • Published:2017

    移动端阅览

  • CAO Yang, JI Hongguang, ZHOU Qiming. Calculation of fume-drainage time of tunnel after blasting[J]. 2017, 49(8): 2017-8. DOI: 10.11918/j.issn.0367-6234.201605096.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1043

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Correlation between ground surface deformation and influential factors in permafrost regions
Incremental intrusion detection mechanism considering cost-sensitive
MetaDAGAN-driven approach for multifunction radar and operating mode recognition
Diverse text-to-image synthesis based on word-level attention
An incremental intrusion detection method based on contrastive learning and relational distillation

Related Author

ZHAO Tao
ZHANG Mingyi
LU Jianguo
YAN Zhongrui

Related Institution

State Key Laboratory of Frozen Soil Engineering, Northwest Institute of Eco-Environment and Resources, Chinese Academy of Sciences
University of Chinese Academy of Sciences
0