您当前的位置:
首页 >
文章列表页 >
Influence of specimen size on bond performance between corroded reinforcing steel bars and concrete
更新时间:2026-10-19
    • Influence of specimen size on bond performance between corroded reinforcing steel bars and concrete

    • Vol. 50, Issue 12, Pages: 89-97(2018)
    • DOI:10.11918/j.issn.0367-6234.201803017    

      CLC: TU375.4
    • Published:2018

    移动端阅览

  • ZHANG Bai, CHEN Jun, YANG Ou, et al. Influence of specimen size on bond performance between corroded reinforcing steel bars and concrete[J]. 2018, 50(12): 89-97. DOI: 10.11918/j.issn.0367-6234.201803017.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

375

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental investigation of the stress-strain response of carbonated concrete under repeated loading
GFRP tube splicing method of GFRP concrete column
Effects of ceramic polishing powder on frost resistance of concrete
Meso-scale finite element analysis of HB-FRP strengthened reinforced concrete beams
Dynamic constitutive relation of concrete with freeze-thaw damage under repeated loading

Related Author

LIU Xiaowei
CUI Huanping
LI Anbang
XU Shanhua
HAN Huafeng
WANG Lianguang
ZHANG Ni
LI Guanglu

Related Institution

School of Civil Engineering,Xi’an University of Architecture and Technology
College of Resources and Civil Engineering, Northeastern University
School of Sciences, Northeastern University
College of Resources and Civil Engineering, Northeastern University
Department of Civil Engineering, Shandong Jiaotong University
0