Based on wind tunnel test uncertainty assessment of AIAA S-071A-1999 and the uncertainty study for the wind tunnel testing
aeroengine performance testing and rocket ground testing in the international space power community
an uncertainty analysis method for the scramjet performance testing was established
and corresponding analysis was given.Results showed that the uncertainty induced by the free-jet testing measurement was predominant in evaluating the overall scramjet performance
and the bias limit was over 90% in the uncertainty of scramjet performance parameters measurements.In conclusion
some valuable results and suggestions about the uncertainty of overall performance of scramjet were obtained
and these results can improve the accuracy in scramjet performance parameters measurements
showing prominent application prospect in scramjet development.