董石榴, 张建星, 彭宇轩, et al. Analysis of Buoyancy Variation in Navigation of Underwater Glider[J]. Mechanical Science and Technology for Aerospace Engineering, 2024, 43(12): 2009-2015.
DOI:
董石榴, 张建星, 彭宇轩, et al. Analysis of Buoyancy Variation in Navigation of Underwater Glider[J]. Mechanical Science and Technology for Aerospace Engineering, 2024, 43(12): 2009-2015.DOI: 10.13433/j.cnki.1003-8728.20230136.
Analysis of Buoyancy Variation in Navigation of Underwater Glider
the relationship between the minimum buoyancy adjustment required for underwater glider to dive to a certain depth and the buoyancy change caused by seawater density and self-deformation is deduced; the force analysis of the diving process is carried out
and the relationship between the gliding speed and the net buoyancy is derived. Through the sea trial data
the buoyancy change of the HUST-1 underwater glider when it dived to 1 000 m was obtained
and the deformation of the pressure shell was calculated. Considering the seawater pressure
the compressive deformation at 1 000 m is obtained with Workbench simulation
which is 31.7% different from the sea test result. Considering the seawater temperature simulation
the change in temperature difference is obtained. It is inaccurate to consider the influence of the pressure on the pressure shell
and the influence of the temperature must also be considered
which also shows that it is feasible to calculate the deformation of the underwater glider with the numerical simulation. Based on this numerical simulation method
in the depth of 0 ~ 1 200 m
considering the density
pressure and temperature of seawater
the change in buoyancy in the divingof HUST-2 underwater glider is analyzed
and the minimum buoyancy adjustment required for diving to 0 ~ 200 m changes. It is very large
more than 500 mL
and within 200 ~ 1 200 m
the minimum required buoyancy adjustment amount changes slowly
only about 85 mL. Afterwards
when the HUST-2 underwater glider conducts sea trials for different diving depths
the minimum buoyancy adjustment calculated in this paper can save testing time and cost.