仲圯. Establishment of the Alive Load on the Equipment Room Floor of the Telecommunication Hub Building[J]. 1999, (1): 8-10. DOI: 10.13992/j.cnki.tetas.1999.01.004.
Establishment of the Alive Load on the Equipment Room Floor of the Telecommunication Hub Building
摘要
探讨了通信枢纽楼的机房楼面活荷载的确定方法及当前在这方面存在的问题
并提出了修改建议.
Abstract
Particular:Discusses the definition method and existing problem of the Equipment Room Floor Alive Load in the Telecommunication Hub Building