您当前的位置:
首页 >
文章列表页 >
Establishment of the Alive Load on the Equipment Room Floor of the Telecommunication Hub Building
更新时间:2026-04-20
    • Establishment of the Alive Load on the Equipment Room Floor of the Telecommunication Hub Building

    • Issue 1, Pages: 8-10(1999)
    • DOI:10.13992/j.cnki.tetas.1999.01.004    

      CLC: TU312.1
    • Published:1999

    移动端阅览

  • 仲圯. Establishment of the Alive Load on the Equipment Room Floor of the Telecommunication Hub Building[J]. 1999, (1): 8-10. DOI: 10.13992/j.cnki.tetas.1999.01.004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

102

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

基于AI技术的无线机房能耗智能管控新思路研究
Development trend of large data center infrastructure
The Tentative Plan and Advice for Telecom Number Arrangement of Our Country
System Design for the Internet

Related Author

陆南昌
柯俊生
刘大洋
吴宝栋
陈志文
覃建国
潘前鸿
崔海东

Related Institution

中国移动通信集团广东有限公司
中国移动通信集团设计院有限公司广东分公司
中国移动通信集团设计院有限公司
浙江电信公司宁波市发公司
0