您当前的位置:
首页 >
文章列表页 >
GSM network development key problem analysis
更新时间:2026-04-20
    • GSM network development key problem analysis

    • Vol. 24, Issue 6, Pages: 6-9(2011)
    • DOI:10.13992/j.cnki.tetas.2011.06.010    

      CLC: TN929.532
    • Published:2011

    移动端阅览

  • 沈忱. GSM network development key problem analysis[J]. 2011, 24(6): 6-9. DOI: 10.13992/j.cnki.tetas.2011.06.010.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

85

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

An instance of AMR optimization and performance analysis in the GSM system
Research on raising wireless utilization rate of GSM network
Research on LTE FDD and GSM spectrum sharing
Research and application of ultra large scale network frequency optimization by AFOS system
GSM bands Refarming to LTE FDD strategic analysis and verification

Related Author

马璐
赵立诚
白晓平
贾磊
郭建光
张力伟
李丹
吕晨光

Related Institution

中国移动通信集团北京有限公司
广东省电信规划设计院有限公司北京分院
中国移动通信集团陕西有限公司
中国移动通信集团河北有限公司
中国移动通信集团设计院有限公司河北分公司
0