Analyzed the indoor user’s request for data services in this article; analyzed the family user request to 4G service and the family wide band service application; analyzed the requirement of wireless network indoor coverage;analyzed the operator’s strategic needs for FMC
analyzed the requirements of the local sub scene business
analyzed on the current situation of the construction of the district broadband cable and 4G indoor coverage and network planning
analyzed construction strategy with different scenarios for cable broadband and 4G wireless network combining different scenarios.