您当前的位置:
首页 >
文章列表页 >
Study on the analysis and integration process of the tower site construction demand
更新时间:2026-04-20
    • Study on the analysis and integration process of the tower site construction demand

    • Vol. 30, Issue 4, Pages: 90-92(2017)
    • DOI:10.13992/j.cnki.tetas.2017.04.027    

      CLC: TN929.5
    • Published:2017

    移动端阅览

  • 宫晓强, 陈儒, 邓也, et al. Study on the analysis and integration process of the tower site construction demand[J]. 2017, 30(4): 90-92. DOI: 10.13992/j.cnki.tetas.2017.04.027.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

53

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Use the site of the tower to realize atmospheric monitoring
Design and research of building and sharing system for tower company
Research on the target network site of mobile communication
Discussion on The Dual-centralized Architecture of Provincial Data Business Operation System
Optimazation of Chinese Mobile’s Communication Tower Standardized Design

Related Author

辛明
俞昌虹
叶敏
谭洪利
姚吉涛
高卫荣
李方村
刘洪

Related Institution

北京中网华通设计咨询有限公司
中国移动通信集团设计院有限公司山东分公司
中国移动通信集团设计院有限公司
北京枫叶联合科技有限公司 北京100080 总经理
中国移动通信集团设计院有限公司河北分公司
0