Research on heat dissipation of C-RAN equipment rooms
摘要
在5G机房的建设和改造当中
由于C-RAN机房的特性
散热问题成为C-RAN机房建设中需要考虑的主要问题之一。本文从C-RAN机房的整体制冷量出发
落脚于C-RAN机房高密度网络柜散热的若干问题
针对BBU集中网络柜内部气流组织的合理性、设备安装工艺等问题展开分析
并提出了相关解决方案。
Abstract
In the construction and renovation of 5 G equipment rooms
due to the characteristics of C-RAN equipment rooms
heat dissipation has become one of the main issues to be considered in the construction of C-RAN equipment rooms. Starting from the overall cooling capacity of C-RAN equipment rooms
this paper discusses the heat dissipation issue of high-density network cabinets in C-RAN equipment rooms and analyzes the rationality of the internal air distribution of BBU centralized network cabinets as well as the equipment installation process