您当前的位置:
首页 >
文章列表页 >
Develop and test of battery shared management equipment
更新时间:2026-04-20
    • Develop and test of battery shared management equipment

    • Vol. 34, Issue 7, Pages: 5-8(2021)
    • DOI:10.13992/j.cnki.tetas.2021.07.002    

      CLC: TM912
    • Published:2021

    移动端阅览

  • 于渤, 陈东旭. Develop and test of battery shared management equipment[J]. 2021, 34(7): 5-8. DOI: 10.13992/j.cnki.tetas.2021.07.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

24

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Method for fine configuration of base station batteries based on big data analysis
Research on automatic preventive maintenance strategy of battery in data center
Anovel switching solution of UPS backup battery
Discussion on communication power system battery backup time
Points of Extending the Service Life of the VCLA Batteries

Related Author

裴皎
郑志刚
汤志刚
纪国强
杨万辉
包静
张小龙
袁林波

Related Institution

中国移动通信集团设计院有限公司浙江分公司
中国铁塔股份有限公司浙江省分公司
中国移动通信集团甘肃有限公司
中国移动通信集团广东有限公司东莞分公司
中国移动通信集团设计院有限公司
0