王卫昀. Margin Calculation and Engineering Design of Fiber Optical Submarine Cable System[J]. 2006, (3): 42-44.DOI:
海底光缆系统设计及线路余量的考虑
摘要
本文简要介绍了海底光缆系统工程设计的方法和要求以及对海底光缆线路的施工和维护
对于各种余量特别是海底光缆线路维护余量的取定进行了说明
可以作为我国海底光缆系统工程设计中线路维护余量的参考。
Abstract
The article briefly introduces the method and requirement of the engineering design of fiber optical submarine cable system
the margin calculation especially for the maintenance of fiber optical cable.It is intended to serve as a useful reference for engineering engaged in the field of fiber optical submarine cable system in our country.