中国移动通信集团设计院有限公司
纸质出版:2011
移动端阅览
[1]李玉昇,赵黎明,叶荣.通信局房电源系统蓄电池后备时间的探讨[J].电信工程技术与标准化,2011,24(01):25-27.
李玉昇, 赵黎明, 叶荣. Discussion on communication power system battery backup time[J]. 2011, 24(1): 25-27.
[1]李玉昇,赵黎明,叶荣.通信局房电源系统蓄电池后备时间的探讨[J].电信工程技术与标准化,2011,24(01):25-27. DOI: 10.13992/j.cnki.tetas.2011.01.005.
李玉昇, 赵黎明, 叶荣. Discussion on communication power system battery backup time[J]. 2011, 24(1): 25-27. DOI: 10.13992/j.cnki.tetas.2011.01.005.
随着高功率密度通信设备的应用
按照现行的相关规范配置蓄电池
通信局房蓄电池的配置容量越来越大
占用了大量的机房空间
给机房的规划建设带来的许多问题。本文将通过对通信局房电源系统蓄电池后备时间的探讨
给出蓄电池后备时间配置合理性的建议。
Communications equipment with high power density applications
in accordance with the relevant norms of the existing battery configuration
the configuration of the battery capacity increases
takes a lot of room space
to the planning and construction of the engine room caused many problems.This power system through the communication of battery backup time
battery backup time is given a reasonable allocation of the proposed.