Code states that the top of the telecommunication equipment whose Center of gravity is high should be taken to reinforce frame.But the reinforce frame is very difficult to install because of space conflicts or other problems in practical engineering.This paper will present a new aseismatic strengthening idea of the whole structure linked with the equipment
the multi-storey chamfer and the building.And then the weaker multi-storey chamfer will be enhancing transformed using a combination method of conceptual design and numerical simulation in order to good seismic performance