we introduced a new kind of thinking of base station power system construction which is suitable for the situation in Pakistan. We analyzed the power cut situation in Pakistan
and made new power system configuration guiding principle. In this paper with the analyzing of the 2013 2014 data of base stations after the new idea of configuration being used through the monitoring system
evaluated the implementation effect of the new configuration. In the end we got the further thinking of the base station power system construction in Pakistan.