the communication between CS domain and IMS domain is more and more. Resulting in a surge in capacity utilization of GMSC and MGCF
the most serious network capacity bottleneck in the release phase. According to the conversion rate
local traffi c model
equipment hardware and software license characteristics
accurate analysis of the network resources during the batch process. When the capacity utilization of GMSC and MGCF equipment is too high and may affect the business
an emergency triage scheme is used to temporarily dredge the business to other MGW under the same GMSC server or MGCF. Through MGCF and GMSC network element fusion can solve this problem more thoroughly. This paper introduces two kinds of common fusion schemes: only GMSC server substitution