A battery shared management equipment was developed to solve the problem of different production date
different capacity and different type batteries using in parallel
which also could decrease 5G auxiliary equipment investment and construction difficulty. The experimental results showed that the equipment could make batteries use in parallel and performed well on peak cut and capacity measurement.